Tile Setting Level 3

Course: CRN #18317 Spring Term

Date: Fri, Sat, 4/7/17-4/8/17, 5/6/17-5/7/17 and 6/2/17-6/3/17, 8:00 AM- 4:30 PM

Location: NWCOC
Member: Tuition: $432.00 Lab Fee: $72.00 Books: $105.00 Registration: $30.00 Total: $639.00
Non-Member: Tuition: $432.00 Lab Fee: $103.00 Books: $150.00 Registration: $30.00 Total: $715.00

(B417-10) Tile Tubs and Fountains
Basic Layout: L-Shaped Room
Layout: Inter-Connecting Rooms
Construction Specifications
(W244-10) Cementitious Backer Units over Wood or Metal Studs, Interior Walls
(B414-10) Cement Mortar over Wood or Concrete Subfloors, Shower Receptors and Walls
Basic Construction Drawing Reading

  • Course: CRN #18317 Spring Term

    Date: Fri, Sat, 4/7/17-4/8/17, 5/6/17-5/7/17 and 6/2/17-6/3/17, 8:00 AM- 4:30 PM

    Location: NWCOC
    Member: Tuition: $432.00 Lab Fee: $72.00 Books: $105.00 Registration: $30.00 Total: $639.00
    Non-Member: Tuition: $432.00 Lab Fee: $103.00 Books: $150.00 Registration: $30.00 Total: $715.00


    (B417-10) Tile Tubs and Fountains
    Basic Layout: L-Shaped Room
    Layout: Inter-Connecting Rooms
    Construction Specifications
    (W244-10) Cementitious Backer Units over Wood or Metal Studs, Interior Walls
    (B414-10) Cement Mortar over Wood or Concrete Subfloors, Shower Receptors and Walls
    Basic Construction Drawing Reading

  • ,